Zhendong Electrochemical Energy Storage Project, Luzhou, Sichuan

Location  /  Time

Luzhou City, China  /  2026.1

Installed Capacity of the Project

eBlock-418 100 MW200 MWh

Project Type

Utility-Scale Power

Introduction

Adopting the concept of "following natural terrain slopes" widely applied in mountain photovoltaic construction, the project deploys 479 sets of Model 418 equipment, covering a land area of around more than 30 mu, with a total of 20 independent energy storage units constructed. Each unit is equipped with a 5MW/10MWh lithium iron phosphate battery system. Tailored to local mountainous conditions, the project adopts a construction scheme combining stepped layout and frame structure, which effectively addresses traditional challenges in mountain areas, including difficult site leveling, large earth filling volume and restricted construction conditions.
The successful grid connection and commissioning of the Shuning Energy Storage Power Station marks another practical achievement of JDEnergy in engineering implementation and system integration of energy storage projects.