The Hanjun Energy Storage Project located in Wuzhong, Ningxia
Location / Time
Wuzhong City, China / 2026.3
Installed Capacity of the Project
Project Type
Utility-Scale Power
Introduction
The project is sited at Dingxiang Family Farm, Yanchi County, Wuzhong City, Ningxia Hui Autonomous Region, and adopts Qidian Energy’s GaLaxy-1-4G energy storage system. A 110kV step-up substation will be built as supporting facilities for the energy storage power station, which is planned to connect to Yanzhou 330kV Substation via one 110kV transmission line. The energy storage station is equipped with 30 sets of 5MW/20MWh liquid-cooled energy storage units. These units are connected to the 35kV AC busbar through eight 35kV collector lines. After voltage boosting by the main transformer, power will be delivered to Yanzhou 330kV Substation via a single 110kV circuit. Shipment commenced on December 15, and the hoisting of all 120 units was completed by January 17, fully demonstrating the Qidian Speed.