Chiwan port Energy Storage Demonstration Project in Shenzhen
Location / Time
Shenzhen City , China / 2023.12
Installed Capacity of the Project
eBlock-745
15 MW60 MWh
Project Type
C&l Energy Storage
Introduction
The Chiwan Energy Storage Demonstration Project in Shenzhen, connected to the grid in December 2023, is an energy storage demonstration project in Shenzhen developed by JDEnergy in cooperation with Zhongkai New Energy. This is the first time that JDEnergy has adopted a 4-hour long-time energy storage system on the user side in Shenzhen, and 60MWh is the largest scale of user side energy storage at present. At the beginning of the project, we took the offshore location into consideration in design, and adequate anti-tidal and anti-seawater backflow measures were taken to effectively guarantee the stable operation of the system in the seaside environment.